Aluminum Capping, Soffit, Eavestrough and Dormer Cladding in East York

How aluminum capping, roof-edge work and dormer cladding fit East York's 1940s and 1950s brick bungalows, storey-and-a-half houses and tight, tree-lined lots.

Updated Written by the Pro Aluminum Siding installation team
On this page
  1. What makes East York houses different from the rest of Toronto?
  2. East York in numbers: the facts behind the exterior work
  3. 9 aluminum upgrades that suit East York bungalows and storey-and-a-halfs
  4. Brick house, very little siding: where does the aluminum actually go?
  5. What does aluminum work cost on an East York house?
  6. Capping, painting or replacing the trim: which makes sense?
  7. How do you plan exterior work around a dormer or second-storey addition?
  8. Step by step: how window capping is done on a 1940s brick opening
  9. Tight side yards and ravine trees: what changes on East York jobs?
  10. Example project scenario: a storey-and-a-half house near Topham Park
  11. Checklist: get your East York house ready for an estimate
  12. Template: a year of exterior upkeep for an East York bungalow
  13. Frequently asked questions
  14. Sources

Quick answer: Most East York homes are brick bungalows and storey-and-a-half houses from the 1940s and 1950s, so the aluminum work is usually capping, soffit, fascia and eavestrough rather than full siding. Siding tends to show up on dormers, gables, rear additions and the frame-built wartime houses. Pro Aluminum Siding measures each opening, bends trim on site, and gives a written quote.

  • East York was a separate township from 1924 and a borough from 1967 until it joined the City of Toronto in 1998.
  • A large share of its housing went up for returning Second World War veterans and young families.
  • On brick homes, the wood around windows, doors, fascia and dormers is where rot and peeling paint start.
  • Toronto’s re-cladding exemption covers non-combustible materials on houses of three storeys or less; porches and second-storey additions need a permit.
  • 5-year workmanship warranty, licensed, insured with liability coverage and WSIB, written contract on every job.

What makes East York houses different from the rest of Toronto?

East York is defined by small, modest homes built quickly after the war. The former township had its own council from January 1, 1924, merged with the Town of Leaside to form a borough in 1967, and became part of the amalgamated City of Toronto on January 1, 1998. Through most of that history, its residential streets were filled with practical one-storey and storey-and-a-half houses for working- and middle-class families.

After the Second World War, returning veterans and their families moved into the area in large numbers. Around Topham Park, near O’Connor Drive and St. Clair Avenue East, the federal government built inexpensive detached homes with front yards and back gardens. Elsewhere, private builders put up rows of red- and buff-brick bungalows on narrow lots, many with a shallow hip or gable roof, a small front stoop and a single side drive.

That history explains what an exterior contractor sees on an East York street today:

  • Brick bungalows where the masonry is sound but every piece of wood trim is 60 to 80 years old.
  • Storey-and-a-half houses with a steep roof and dormers clad in wood, asbestos-cement shingle, old aluminum or vinyl.
  • Wartime “Victory” houses, originally finished in clapboard, many of them re-sided at least once since.
  • Bungalows with a new second floor, part of a long trend of owners building up instead of moving out.

Each of these needs a slightly different scope. This page walks through them so you know what to ask for before anyone arrives with a ladder. For an overview of the whole city, see our Toronto service area page.

East York in numbers: the facts behind the exterior work

A few checkable figures put the local conditions in context. We list where each came from in the Sources section at the end of this page.

  • Population: the East York area had 116,399 residents in the 2021 census, up slightly from 115,185 in 2001, at a density of about 5,475 people per square kilometre. That density is why side yards are tight and neighbours’ driveways often become the staging area.
  • Founding dates: township incorporation in 1924, borough status in 1967, amalgamation in 1998. Most detached homes in the central part of the district date from the late 1940s and the early baby-boom years.
  • Wartime housing program: the federal Wartime Housing Corporation was created in early 1941 and folded into CMHC in 1947. The Victory Housing program produced roughly 30,000 homes during the war years, and Topham Park is one of the East York pockets that came out of that era.
  • Original finish: those wartime houses were simple bungalows on square or rectangular foundations with clapboard siding and pitched roofs, a pared-down Cape Cod style.
  • Precipitation: Environment and Climate Change Canada normals for the Toronto city station show about 822.7 mm of precipitation a year, falling on roughly 150 days, including about 121.5 cm of snow.
  • Winter cold: January’s daily mean temperature at that station is about −3.5 °C, which means a lot of freeze-thaw cycling at the fascia line and around window sills.

Put together, the numbers describe a dense district of old houses that get wet about 150 days a year and freeze and thaw all winter. That combination is hard on exposed wood, and East York has a lot of exposed wood hiding behind its brick.

9 aluminum upgrades that suit East York bungalows and storey-and-a-halfs

The best upgrades on a brick East York house are the ones that protect the wood the brick doesn’t cover. Here they are in the order we usually see them pay off.

1. Window capping on original wood frames and sills

Wood window frames and sills on postwar brick houses are the first thing to fail, especially on the south and west walls. Even where the windows themselves have been replaced, the exterior brickmould and sill often remain original. Window capping replacement wraps those pieces in custom-bent aluminum so they never need paint again. Any soft wood is cut out and replaced first.

2. Soffit and fascia along the short eaves

Many East York bungalows have short roof overhangs with a painted wood fascia board and a plywood or tongue-and-groove soffit. Vented aluminum soffit and fascia closes gaps where squirrels and birds get in, adds intake ventilation to the attic, and gives the new eavestrough a solid board to hang from.

3. Seamless eavestrough sized for the roof, not the era

Original eavestroughs on small houses were often narrow, and many have been patched for decades. A new seamless run, properly pitched to downspouts that discharge away from the foundation, matters a lot on narrow lots where the water otherwise ends up against the basement wall or in the neighbour’s side yard. Our eavestrough installation and repair page covers sizing and guards.

4. Dormer cladding on storey-and-a-half homes

The dormers on a storey-and-a-half house sit above the brick line, so they are almost always framed and clad in something lighter. That cladding takes the worst of the weather. Re-cladding the cheeks and face of each dormer in aluminum, and capping the dormer window trim, is often the single biggest exterior job on these homes. See porches and dormers for how we handle it.

5. Gable-end siding

On houses where the brick stops at the top of the main-floor walls, the triangular gable above is usually framed and sided. That small area is where aluminum siding actually goes on many East York homes. It is a contained, affordable job that can be done alongside the soffit and fascia.

6. Cladding a second-storey addition to match or contrast

When owners add a full second floor to a bungalow, they rarely extend the brick upward. The new storey is usually sided, and aluminum is a common choice because it is non-combustible and holds a crisp line at corners. The aluminum siding installation and replacement page explains profiles and colours.

7. Entry door frame capping

Front doors on these houses often sit under a small canopy or no cover at all. The jambs and brickmould take rain, salt from the walk and constant knocks. Capping the frame after any rot repair stops the yearly scrape-and-paint cycle.

8. Garage and carport frame capping

Detached rear garages are common behind East York bungalows, many reached by a shared or narrow drive. Their wood door frames are usually in rough shape. Garage door frame capping is measured, cut and bent to fit each opening, then fastened with adhesive and/or screws.

9. Porch trim and small canopy repair

Many front stoops have a small roof or a wood porch with posts, beams and a ceiling. Capping posts and beams and adding an aluminum soffit to the porch ceiling refreshes the whole front of the house. If the porch structure itself is failing, that becomes a repair or rebuild with its own permit questions.

Get a written estimate

We measure on site, explain what we found and put the price in writing. Free, with no pressure.

Brick house, very little siding: where does the aluminum actually go?

On a typical East York brick bungalow, aluminum covers the trim, the roof edge and the parts of the house that were framed rather than built in masonry. We use the framework below during an estimate visit. It is our own inspection order, built from the way these houses tend to age, and you can use it yourself before calling anyone.

Area of the houseWhat we look forUsual aluminum fixWho it matters most for
Window sills and brickmouldSoft wood under paint, cracked sill noses, failed caulking at the brickRot repair, then window cappingEvery brick bungalow with original exterior trim
Fascia boardPeeling paint, gutter spikes pulling out, sag between raftersFascia replacement or wrap, new eavestrough hangersHouses with original or patched eaves
SoffitHoles, droppings, no venting, stained plywoodVented aluminum soffitHouses with attic moisture or pests
Dormer cheeks and faceLoose old siding, water stains inside the upper roomDormer cladding and window cappingStorey-and-a-half houses
Gable endsWood or asbestos-cement shingles, gaps at the rakeAluminum siding and rake trimGable-roofed bungalows
Rear additions and back porchesMismatched cladding, rot at the sill plateSiding, capping, sometimes structural repair firstHouses extended in the 1960s to 1980s
Garage framesSplit jambs, missing paint, impact damageGarage door frame cappingLots with a rear detached garage

One more note on older houses: dormers and gables from the 1940s and 1950s were sometimes finished with cement-based shingles that can contain asbestos. We will tell you if we see a material that may need testing before removal. Where it is sound and the plan allows, cladding over it rather than tearing it off is sometimes an option, but that is a decision to make with full information.

What does aluminum work cost on an East York house?

Because most of the work is trim and roof edge rather than whole walls, East York jobs are usually priced per window, per opening or per linear foot. The figures below are typical GTA ballpark ranges (2026). Your written quote after an on-site measure is what counts.

ItemBallpark rangeEast York notes
Window capping$175–$450 per windowDeep brick returns and sill shape move the price
Wood rot repair before capping$150–$900 per openingCommon on south and west walls of postwar houses
Entry door frame capping$250–$600 per doorFront, side and rear doors are often all candidates
Garage door frame capping$350–$900 per openingSingle-car rear garages are most common here
Aluminum soffit$8–$14 per linear ftShort overhangs; rear additions add length
Aluminum fascia$7–$13 per linear ftRotten sub-fascia is replaced before wrapping
Seamless eavestrough, 5″$8–$14 per linear ftUsually enough on a one-storey roof
Seamless eavestrough, 6″$10–$17 per linear ftWorth it below big valleys or on tall additions
Downspouts$10–$18 per linear ftPlacement matters on tight side yards
Dormer cladding/capping$1,500–$7,000Per dormer scope; access and size drive it
Aluminum siding, supply and install$9–$16 per sq ftGables, dormers and second-storey additions; tear-off and insulation board extra
Vinyl siding (for comparison)$6–$12 per sq ftShown for comparison only
Porch repair or rebuildQuoted per projectStructural scope varies widely; permits may apply

What moves the price on these houses: height (a storey-and-a-half dormer is harder to reach than a bungalow eave), access along narrow side yards, how much rot is found once old trim comes off, colour and gauge, the number of custom bends around brick returns, and the time of year.

Capping, painting or replacing the trim: which makes sense?

For original wood trim on a brick house, capping is usually the best long-term value, but it is not always the right first step. This comparison shows when each option fits.

OptionBest whenUpkeep afterwardsWatch out for
Scrape and repaintWood is sound, you like the painted look, budget is very tightRepaint every few years on exposed wallsOld layers may contain lead paint; test before sanding
Aluminum capping over existing woodWood is mostly sound or repairable, you want no more paintingOccasional wash and caulking checkCapping over rot traps it; soft wood must come out first
Rot repair, then cappingSome sills or jambs are soft, the rest is solidSame as cappingHidden rot can be worse than it looks from outside
Replace the window or door, then capUnits are failing, drafty or foggedSame as cappingWindow replacement is separate work from a window installer

How do you plan exterior work around a dormer or second-storey addition?

Plan the cladding as part of the addition, not as an afterthought. A lot of East York bungalows are getting new upper floors or larger rear dormers, and the order of work makes a real difference to cost and finish.

Start with permits and drawings

Toronto lists second- and third-storey additions and porches among the projects that need a building permit. A structural dormer that changes the roof framing should be treated the same way until Toronto Building tells you otherwise. Get the permit drawings first, because they fix the wall heights, window positions and roof overhangs the aluminum has to fit.

Decide how the new and old will meet

The second storey will almost always be a different material from the brick below. Decide early whether you want the siding to contrast with the brick or blend with it, and where the transition sits. A clean horizontal band, flashed properly at the top of the brick, looks intentional. A ragged line does not.

Match the roof edge on both levels

When the upper floor gets new soffit and fascia, the lower roof edge on the old part of the house will suddenly look tired. Doing both at once usually costs less than coming back later, and the colours match.

Size the eavestrough for the new roof

A taller house sheds water from a bigger roof onto a smaller lower roof or straight down past the brick. Reconsider downspout positions and whether a 6″ trough is warranted on the upper level.

Sequence the trades

Framing, roofing and window installation come first. Then the wall wrap and flashing, then siding and capping, then soffit, fascia and eavestrough. We can work to your general contractor’s schedule or handle the exterior aluminum package on its own once the shell is closed in.

Step by step: how window capping is done on a 1940s brick opening

Capping a window in a brick wall is precise sheet-metal work. Here is how a typical opening goes from peeling wood to finished aluminum.

  1. Inspect the wood. We probe the sill, sill nose, brickmould and jambs with an awl. Anything soft or crumbling is marked for repair.
  2. Remove failed caulking. Old sealant between the wood and the brick is cut out so the new joint can bond to clean surfaces.
  3. Repair rot. Damaged sections are cut back to sound wood and replaced or rebuilt. The repair has to be solid and dry, because the aluminum will cover it for years.
  4. Measure each face. Every opening is measured individually. Older brick openings are rarely square, and sills on postwar houses often have a different slope on each window.
  5. Cut and bend the aluminum. Coil stock is cut and formed on a brake to match each profile, including the drip edge on the sill so water sheds away from the brick.
  6. Fit the pieces in the right order. Sills go on first, then the sides, then the head piece lapped over them, so water always runs over a joint rather than into it.
  7. Fasten and seal. Pieces are secured with colour-matched fasteners and adhesive where appropriate, then the perimeter at the brick is sealed with a quality exterior sealant.
  8. Check the drainage. We confirm water runs off the sill and that weep paths in the window unit are not blocked by the new trim.

How long a full house takes depends mostly on how much rot repair turns up. Our window and door frame repair page goes deeper on rot.

Not sure what your home needs?

Call and describe what you see. We will tell you honestly whether it is a repair, a replacement or nothing yet.

Tight side yards and ravine trees: what changes on East York jobs?

Two things shape the logistics of almost every East York exterior job: narrow side yards and big trees. Planning for both avoids delays and neighbour friction.

Working in a narrow side yard

Many lots leave only a metre or so between houses, sometimes with a shared drive. Ladders and short scaffolds have to fit in that gap, and there may be no room to set a ladder at a safe angle without stepping onto the next property. Before work starts, it helps to:

  • Let your neighbour know the dates and ask whether brief access to their side is acceptable.
  • Move bins, bikes, air-conditioning covers and planters out of the side passage.
  • Point out gas meters, hydro masts and cable lines on that wall.
  • Agree where cut-offs and old trim will be piled before disposal.

Leaf load from the Don Valley ravines

Much of East York borders the Don River valley and its tributary ravines, and streets near the valley edge carry mature canopy. Those trees mean eavestroughs fill quickly in autumn and again with seeds in spring. Gutter guards, larger downspout openings and an extra downspout on a long run are often worth the small added cost on these lots.

Protected trees and ravine lands

The City of Toronto requires a permit to injure or remove a protected tree, and all designated ravine and natural feature areas are protected. Revised tree bylaws took effect on September 1, 2026, with stronger protection for existing trees. Aluminum work rarely affects trees, but cutting limbs to clear a ladder or staging material on roots can. If a tree is in the way, check with Toronto Urban Forestry before anyone trims it.

Example project scenario: a storey-and-a-half house near Topham Park

Example project scenario (illustrative)

This scenario is illustrative and based on the kind of job typical on postwar East York streets. It does not describe a specific customer or address.

The house: a storey-and-a-half detached home from the late 1940s, brick on the main floor, two front dormers clad in old aluminum siding that has dented and chalked, a rear shed dormer added later in wood siding. The original wood sills and brickmould are under several layers of paint. The eavestrough is a patched 4″ style with one downspout emptying beside the foundation on the side yard.

What the inspection found: two sills on the west side were soft right through; the front dormer windows had rot at the lower corners; the fascia was sound except for one corner under a leaking downspout outlet. The side yard was just over a metre wide, shared with the neighbour’s drive.

The scope:

  • Rot repair on the two failing sills and both dormer windows.
  • Capping on all main-floor windows, the front and side doors, and the dormer windows.
  • Re-cladding the two front dormers and the rear shed dormer in aluminum siding with matching corner trim.
  • New vented aluminum soffit and fascia around the whole roof edge.
  • Seamless 5″ eavestrough with an added downspout and leaders that carry water away from the shared side yard.

How it would be priced: per window and door for capping, per opening for rot repair, per dormer for the cladding, and per linear foot for soffit, fascia and eaves, using the ranges listed above. The written quote would list each line separately so the owner could phase the work if needed.

The takeaway: on a house like this, there is almost no wall siding below the roof line, yet the aluminum package is still substantial. The dormers and trim carry the job.

Checklist: get your East York house ready for an estimate

A short walk around the house before the estimate visit makes the quote faster and more accurate.

  • Count your windows and exterior doors, including basement windows with wood frames.
  • Press a screwdriver gently into the lowest corner of each sill and note any that feel soft.
  • Look up at the fascia from the street for sagging, gaps or missing paint.
  • Check the soffit for holes, nests or stains.
  • Note which downspouts drain toward the house or the neighbour.
  • Photograph the dormers and gables from the sidewalk.
  • Find out whether you have any plans for new windows, a second storey or a porch rebuild in the next few years.
  • Note any trees overhanging the roof and whether they are on your lot, the neighbour’s or city land.
  • Clear the side passages if you can.

You can book through the free estimate form or call (647) 560-9038. We will measure on site and follow up with a written quote.

Template: a year of exterior upkeep for an East York bungalow

Once the trim is capped, maintenance becomes a short seasonal routine. Copy this into your phone calendar.

Template: seasonal maintenance calendar

Early spring (after the last hard freeze): clear seeds and grit from the eavestroughs; check that downspout leaders are reconnected after winter; look for ice damage at the fascia corners.

Late spring: wash capping and soffit with a soft brush and mild soap; check sealant joints at the brick around each window; note any gaps for touch-up.

Summer: trim back shrubs touching the walls on your own property; confirm no birds or wasps have moved into soffit gaps; book any larger work for late summer or early autumn.

Mid-autumn: clean the eavestroughs once most of the leaves are down, sooner if you are near the ravine canopy; flush downspouts with a hose.

Early winter: watch for icicles forming at one spot, which can point to a blocked outlet or poor pitch; keep downspout discharge clear of snowbanks.

Every few years: walk the house with a contractor to recheck sealant, fasteners and any trim pieces bumped by snow shovels or bins.

East York sits between older parts of the city and the postwar suburbs. If you own property nearby, our North York page covers the larger postwar lots north of the district, and the Scarborough page deals with the 1950s and 1960s bungalow belt further east. For the full trim-wrapping overview, see aluminum capping.

Book a free on-site measure

Every job comes with a written contract and our 5-year workmanship warranty.

Frequently asked questions

Do I need aluminum siding on a brick East York bungalow?

Usually not on the main walls. Brick in good condition does not need covering. The aluminum work on these houses is mostly window and door capping, soffit, fascia and eavestrough, plus siding on gables, dormers or additions that were framed instead of built in brick. We quote only the areas that actually need it.

Can you cap windows that were already replaced with vinyl units?

Yes. Many East York houses have newer vinyl windows set into the original wood brickmould and sills. The outside wood is what rots and peels. We repair any soft wood, then wrap the brickmould and sill in custom-bent aluminum that is sealed to the brick and to the window frame.

Is a building permit needed for capping, soffit or eavestrough?

Toronto’s permit guidance exempts re-cladding a house of three storeys or less with non-combustible material, other than brick or stone veneer. Trim capping and roof-edge work generally fall outside permit requirements, but porches and additions do not. Always confirm your specific project with Toronto Building before starting.

What should I do about the old dormer siding on my storey-and-a-half?

Have it inspected before deciding. Old aluminum can often be removed and replaced cleanly. Wood siding may hide rot in the sheathing. Older cement-based shingles may contain asbestos and should be tested before removal. Once the condition is known, re-cladding the dormer cheeks and face in aluminum is a common and durable fix.

How do you work in a side yard that is only about a metre wide?

We use ladders and compact staging sized for narrow passages, keep material at the front or back of the lot, and work one section at a time. It helps if you tell your neighbour the dates ahead of time. If safe access requires stepping onto the next property, we ask before doing so.

Will capping hide rot instead of fixing it?

Not if it is done properly. Capping over soft wood just traps moisture and lets the decay spread. That is why every opening is probed first and any rotten sections are cut out and rebuilt before the aluminum goes on. Rot repair is priced separately so you can see exactly what was found.

Should I do the exterior trim before or after a second-storey addition?

Plan it together. The addition changes roof edges, wall heights and drainage, so it makes sense to clad the new storey, redo the soffit and fascia on both levels, and size the eavestrough for the larger roof in one coordinated scope. Doing the lower trim first and then disturbing it during construction wastes money.

Do gutter guards make sense near the Don Valley?

Often, yes. Homes close to the ravines and under mature street trees collect leaves and seeds quickly. Guards reduce how often you clean, though they do not eliminate it. Larger downspout outlets and an extra downspout on long runs help too. We can suggest options during the estimate.

What colours work on red or buff brick?

White and off-white trim is the classic match for postwar red brick, while darker bronze, black or charcoal capping gives a more modern look on buff brick. Bring a photo of the brick in daylight to compare samples. Colour choice can slightly affect price and lead time.

What warranty and paperwork do I get?

Every job comes with a written contract and a 5-year workmanship warranty. We are licensed and carry liability insurance and WSIB coverage. Estimates are free, either by phone at (647) 560-9038 or through the online form, and the final price is set in writing after an on-site measure.

Sources

Call Now: (647) 560-9038